Description: Aavid 80 mm Cooling Fan - 12 V DC - 32 CFM - 27 dB - 12V DC Fan Electric fan manufactured by Aavid Dimensions: 80 mm x 80 mm x 25 mm Nominal voltage: 12 V DC Current: 120 mA Power: 1.4 Watts 7 blade plastic impeller Speed: 2,500 RPM Airflow: 32 CFM Noise: 27 dB 12" long outgoing power leads with bare ends
Price: 7.95 USD
Location: Metuchen, New Jersey
End Time: 2024-01-31T22:17:12.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Seller
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Return policy details:
MPN: Does Not Apply
Item Width: 80 mm
Voltage: 12 V
Item Length: 80 mm
Item Height: 25 mm
Fan Diameter: 80 mm
Material: Plastic
Maximum Airflow Volume: 32 CFM
UPC: Does not apply
Maximum Fan Speed: 2500 RPM
Power Connection: Bare Wire Ends
Brand: Aavid
Color: Black
Type: Fan